As part of utility duct project, Charlie Villa-Shimla Club road tarring to finish by May 5

Sharma said that there would be no inconvenience to the public as the road would remain open for pedestrians, ambulances and fire…

Sharma said that there would be no inconvenience to the public as the road would remain open for pedestrians, ambulances and fire engines. Marshals would be deployed to regulate traffic and necessary signage and barricades would be installed. Additional police personnel would be deployed as required, he added.

He said that the tarring work would be completed within the stipulated time frame and no debris or construction material would be left on the road and smooth traffic flow would be maintained. He added that the Police Department would be informed before the work begins and all safety measures would be ensured at the site. “Full cooperation with the local administration will be ensured and in case of an emergency, the authorities concerned will be informed immediately,” he asserted.

Leave a Reply